Tail Sealing Box

To conquer the age-old problem of material spilling off the tail of the conveyor, install the Martin® Tail Sealing Box. Installed on the rear of the chutework, the box uses Martin® ApronSeal™ Skirting and Strip Rubber to create an effective seal to keep material on the conveyor.

Features and Benefits:

  • Seal keeps material from sliding off the belt
  • Belt motion deflects tail seal to prevent accumulation at back of box
  • Deflected sealing strip contains rollback without scraping off adhered material
  • Return material to belt through easy-opening Martin® Inspection Door
  • Field-welded on chute wall to ensure precise fit

Our technicians and engineers are available to provide expert advice and assistance on this product and all of your bulk material handling questions and problems. Please contact us today and let us help!

Resources

Brochure - Transfer Point Solutions Download
Tech Data Sheet - Tail Sealing Box Download

View Additional Resources

We Solved Their Problems!
Let us help you solve yours as well. All products and services provided by Martin Engineering carry our Absolutely No Excuses Guarantee. If we don't solve your problem, we will fully refund your money or provide a different solution for you. Period.
Transfer Point Products Improve Severe Spillage And Dust Problems
At a cement plant in Kentucky, the clinker transport system had severe problems with the escape of spillage and airborne dust in the loading zones of three conveyors. Martin® Transfer Point Solutions were recommended to stop the spillage and dust problems. To improve the clinker conveying, the plant agreed to upgrade the transfer points.
Read Case Study
Spillage Problems Corrected By Transfer Point Redesign
A coal-fired power plant was suffering from extensive spillage and other problems. The plant’s coal-conveying system needed an extensive upgrade, including new belt cleaning systems and improved transfer point systems.
Read Case Study
Transfer Point Solutions Increase Productivity At Container Board Plant
Bark and wood waste are used as fuel to produce heat and steam for this container board plant. A series of belt conveyors 36 to 48 inches wide carry bark to the powerhouse. The Pine Hill Mill began a program to improve its materials-handling operations and eliminate fugitive materials. The bark conveying system was the first system to be upgraded.
Read Case Study
Power Plant Needs Cleaner, Safer, More Productive Material Handling System
The Warrick Power Plant is operated by the Alcoa Generating Company to supply electricity for smelting operations at Alcoa’s Warrick facility. The plant’s coal handling equipment needed reconstruction and improvement, including improved systems to control spillage and dust, to provide a cleaner, safer and more productive coal handling system.
Read Case Study
Paper Plant Having Trouble With Fugitive Material
The release of airborne dust can cause health concerns and create negative attention from regulatory agencies. Any material that spills off the conveyor is a loss - loss in material, profit and efficiency. The spillage also creates the need for manual cleanup which takes man-hours and is a dangerous task - putting workers in harm's way.
Read Case Study
MartinPLUS® Installation Services Redesign Power Plant Transfer Points
An energy company in Lansing, Iowa was facing severe spillage problems in underground loading points. The steel structure on part of conveyor feeding system was shot. It was old and worn out. There were bows and dips in the skirtboard, and it wouldn't stay sealed. This created excessive dust and spillage in the tunnel.
Read Case Study
Transfer Point Solutions Resolve Carryback At Kentucky Energy Plant
An energy company in Kentucky was having problems with carryback on their side-by-side transfer belts carrying coal from the central reclaim tunnel to the bunkers. They hired Martin Engineering to find a solution. Martin recommended a variety of belt support, belt sealing, tail protection and dust containment solutions as well as safety accessories.
Read Case Study
Martin Transfer Point Products Reduce Risk Of Fire Or Explosion
This power plant had dust and spillage escaping from the coal-handling systems. To boost material-handling efficiency and reduce the risk of fire or explosion, Martin installed taller and longer skirtboard walls, new belt support systems, abrasion-resistant wear liners, and a multi-layer, low-pressure sealing system on the outside of the chute walls.
Read Case Study

Free Engineering and Application Assistance

Our technicians have solved problems for people in your industry all over the world. Take advantage of our wealth of knowledge. Tell us about your situation today to learn how Martin can improve your performance, safety and bottom line - with no obligation. We want to ensure that you choose the right solution for your exact needs and we are willing to invest the time upfront to get it right the first time.