Problem

Coal movement was computer-modeled to make certain the proposed chutes achieved plant objectives.

Plant Daniel’s two 500 MW units burn 2.9 million tons of a blend of bituminous and PRB coal annually. The coal handling system had problems with dust and spillage. The plant wanted to reduce dust and spillage, and their related hazards, and at the same time control the expense for the contract labor used for clean up and wash down procedures.

Solution

An engineering drawing shows “hood” for Conveyor 1C at Plant Daniel.

Plant Daniel decided to install flow-engineered chutes on four transfers: at the crusher discharge (loading Conveyor C) and the tripper feed (loading Conveyor D) on both the PRB coal (#1) and bituminous (#2) sides of the system. Mississippi Power selected Martin® Inertial Flow™ Transfer Chutes from Martin Engineering. To evaluate the performance of the custom-engineered chutes, Plant Daniel underwent a three day pre- and post-installation dust testing procedure. Collecting plates and pails were placed in the same locations to gather dust and spillage. Collected material was weighed for a comparative analysis.

Results

The testing showed dramatic reductions in the amount of dust and spillage following installation of the engineered-flow chutes. Spillage levels were dramatically reduced with valid tests consistently showing reductions of 80% or better. The levels of airborne dust were reduced approximately 50%. The chutes performed well below PM-2.5 requirements, with results running approximately 65% below the EPA standard of 2mg/m3. As a result of the installation of the engineered chutes, wash downs have been reduced from “every-day-without-fail,” to “every couple of days, when required." This was accompanied by a similar reduction in the hours (and cost) for contract labor used for these cleanup chores. After the chutes were installed, Mississippi Power cancelled the planned addition of automated wash down systems at two of the transfers. The performance of the engineered-flow chutes eliminated the need for this $325,000 capital project. Results from this installation were presented at the COAL-GEN Conference.

Resources

PDF - Printable Version of Case Study Download
Brochure - Coal-Fired Power Industry Download
Brochure - Martin Engineering Corporate Profile Download

View Additional Resources

We've solved your problem somewhere before!

While your problem seems unique and frustrating, with 70+ years of solving similar problems around the world, and with the most experienced and educated people on our teams, we can assure you that we’ve “Been There, Done That.” At least close enough to know what needs to be done next and adjust for your situation.

Put Us To The Test For Free! Let Us Give You a Solution.